Skip to main content
Cloud Migration Services

Cloud migration that moves your systems without moving your downtime.

Hoop Interactive migrates on-premise, legacy, and cloud-to-cloud workloads to AWS, Azure, or Google Cloud — with a tested rollback plan and a parallel run that keeps your systems live throughout the move.

See Our Process
Trusted by businesses worldwide
1–3 wksReadiness assessment
WeeklySprint demos
RollbackTested before every cutover
0Vendor handoffs
Overview

What is cloud migration?

Cloud migration is the process of moving applications, data, and infrastructure from on-premise servers, or from one cloud provider, to a new cloud environment such as AWS, Azure, or Google Cloud. The move involves more than copying files: it means mapping dependencies, choosing a migration strategy for each workload, and cutting over without losing data or availability.

Not every workload migrates the same way. Cloud architects group migration approaches into what's commonly called the 7 Rs, with three strategies covering most real projects: rehosting, replatforming, and refactoring. Most migrations use a mix of all three across different applications rather than one approach for everything.

Dependencies mapped
Nothing moves before we know what it connects to.
Wave-based
Phased in manageable stages, not one high-risk cutover.
Parallel run
Old and new validated side by side before the switch.
Tested rollback
A verified path back, proven before every cutover.

Rehost, replatform, or refactor?

Three migration strategies — and the workload each one genuinely fits.

StrategyWhat it doesBest fit
Rehost (lift-and-shift)Moves the application to the cloud with no code changes.Fast timelines, legacy apps not worth rewriting yet.
ReplatformMakes targeted optimizations during the move, such as a managed database.Apps that benefit from cloud services without a full rewrite.
Refactor (re-architect)Rebuilds the application to use cloud-native services fully.Core systems where long-term performance and cost matter most.
The Deep Dive

Where migration cost actually comes from.

Why strategy choice outweighs almost everything else, and how to pick per application.

Why migration strategy determines the real cost

Rehosting is the cheapest and fastest strategy upfront, but it can cost more than staying on-premise over three years, since the application still isn't optimized for cloud pricing. Refactoring costs the most to build but produces the biggest long-term savings and performance gains. The right mix depends on which applications are core to your business and which are candidates to retire.

Rehost vs. refactor: which do you need?

Rehost if you're on a tight timeline or the application is a lower priority you'll revisit later. Refactor if the application is core to the business and the cloud's scalability or managed services would meaningfully improve it.

Why move to the cloud?

A well-planned migration replaces fixed, aging infrastructure with capacity that scales on demand and infrastructure your team can actually maintain.

Scales for traffic spikes

Capacity adjusts on demand without pre-provisioning hardware.

Cuts hardware costs

Maintaining and refreshing physical servers stops being a line item.

Better disaster recovery

Cloud-based backup and failover replace a plan nobody has tested.

Access to managed services

Databases, AI, and other cloud-native services become available.

Faster feature launches

Infrastructure stops being the bottleneck on shipping.

Reduced security risk

The provider's built-in compliance tooling raises your baseline.

Cloud migration services we offer.

We scope the engagement around your workloads and timeline, not a fixed migration package.

01

On-premise to cloud migration

Moving servers, applications, and data from physical infrastructure to AWS, Azure, or Google Cloud.

02

Cloud-to-cloud migration

Moving workloads between cloud providers when pricing, features, or consolidation drive the switch.

03

Database migration

Moving databases with live replication, keeping source and destination in sync until cutover.

04

Application refactoring

Rebuilding applications to use cloud-native services: managed databases, serverless, auto-scaling.

05

Legacy system migration

Moving older systems that need careful dependency mapping before any workload gets touched.

06

Hybrid cloud migration

Splitting workloads between cloud and retained on-premise systems where full migration isn't the goal.

Readiness Check

Signs you need cloud migration.

Four situations send most IT and engineering leads to us for migration work.

  • 01

    Physical hardware needs replacing

    An aging server refresh is coming up, and the cost comparison against cloud is worth running.

  • 02

    Traffic spikes cause outages

    Seasonal or growth-driven demand exceeds what your fixed on-premise capacity can handle.

  • 03

    You're consolidating cloud providers

    Workloads are scattered across providers or accounts, and it's time to bring them under one roof.

  • 04

    Disaster recovery is a real gap

    A hardware failure or site outage would take critical systems down with no fast way to recover.

Common cloud migration mistakes we help you avoid.

These five mistakes account for most of the over-budget or failed migrations we get asked to rescue.

01

Rehosting everything by default

Critical

Lift-and-shift for every workload often costs more than staying on-premise over three years. We match strategy to each application's actual priority.

02

No tested rollback plan

Critical

Migrating without a way back means a mid-migration problem becomes a crisis. We test the rollback path before every cutover, not after something breaks.

03

Ignoring data egress costs

High

Moving data out of a cloud provider often costs more than moving it in. We factor egress fees into the plan from the start, not as a surprise later.

04

Underestimating the parallel-run window

Medium

Running old and new systems together costs more the longer it lasts. We scope the parallel-run period realistically, not optimistically.

05

Skipping dependency mapping

Critical

Migrating an application without mapping what it connects to breaks integrations nobody remembered existed. We map dependencies before touching anything.

How we run your migration.

Six stages, from workload inventory to a tuned, decommissioned cutover. We work in weekly sprints with a status update every Friday.

01

Discovery & readiness assessment

We inventory your workloads, map dependencies, and assess which applications are ready to move.

1–3 weeks · Discovery
02

Migration strategy & wave planning

We assign a strategy — rehost, replatform, or refactor — to each workload and sequence the migration into waves.

1–2 weeks · Planning
03

Architecture design

We design the destination architecture and Infrastructure as Code for each wave before migration begins.

1–3 weeks · Architecture
04

Migration execution

We migrate each wave in weekly sprints, with a working demo and status update every Friday.

3–24 weeks · Execution
05

Testing & parallel run

We run old and new systems in parallel, validating data integrity and performance before cutover.

1–4 weeks · Validation
06

Cutover & optimization

We complete the cutover, decommission the source where appropriate, and tune costs post-migration.

Ongoing · Optimization

Cloud migration cost and timeline.

Three factors drive the price: migration strategy, workload count, and data volume. Ongoing cloud hosting and parallel-run overlap bill separately from your provider.

Lift-and-Shift MigrationBest for: tight timelines, lower-priority apps
Investment
$15,000–$50,000
Timeline
6–12 weeks
Scope
1–5 applications
Code changes
Minimal
Strategy
Rehost
Replatform MigrationBest for: apps benefiting from cloud services
Investment
$50,000–$150,000
Timeline
12–20 weeks
Scope
Multi-app, phased waves
Included
Managed DB upgrades
Delivery
Infrastructure as Code
Refactor / Cloud-Native RebuildBest for: core, high-priority business systems
Investment
$150,000–$400,000+
Timeline
20–40+ weeks
Scope
Full rearchitecting
Included
Auto-scaling, serverless
Compliance
Security hardening
Our Stack

The technology behind your migration.

Proven, well-documented tools, chosen for reliability and minimal migration risk.

Cloud Platforms
AWSMicrosoft AzureGoogle Cloud
Migration Tools
AWS Migration HubAzure MigrateTerraform
Data & Monitoring
PostgreSQLPrometheusGrafana

Ways to work with us.

Pick the model that fits your project and team. All four include weekly demos and full infrastructure ownership.

Fixed-Scope Project

A defined workload list, timeline, and price agreed before we start. You know the exact cost up front.

Best for fixed budgets

Dedicated Team

Migration engineers working as an extension of your team through cutover and beyond.

Best for large programmes

Staff Augmentation

A senior cloud migration engineer added to your existing team to close a skills gap.

Best for existing IT teams

Post-Migration Retainer

Ongoing monitoring, cost optimization, and support after cutover, billed monthly.

Best after cutover
What's Included

Every migration engagement comes complete.

No hidden gaps. Each engagement includes everything you need to migrate and stabilize on the new platform.

Readiness assessment
A clear inventory and dependency map before any workload moves.
Migration strategy plan
The right approach assigned to each workload, not a one-size-fits-all move.
Wave-based execution
Migration phased in manageable waves instead of one high-risk cutover.
Data validation
Record counts and integrity checked after every transfer stage.
Parallel-run testing
Old and new systems validated side by side before cutover.
Tested rollback plan
A verified path back to the source system if something goes wrong.
Cost optimization
Right-sized resources configured post-migration, not left on defaults.
Documented handover
Version-controlled infrastructure code you own outright.

Cloud migrations we deliver across every sector.

The process stays the same. The compliance and workload needs change by industry.

Financial Services

Migrations built around PCI DSS and audit requirements.

Healthcare

HIPAA-aligned migration of patient and operational systems.

Manufacturing

ERP and operational system migration with minimal downtime.

Retail & Ecommerce

Migrations timed around seasonal traffic and peak periods.

Professional Services

Document and client system migration with data continuity.

Logistics

Real-time tracking system migration with zero-downtime cutover.

Media & Entertainment

Content and delivery infrastructure migration at scale.

Enterprise IT

Multi-application, multi-year migration programs.

FAQ

Cloud migration questions

The questions IT and engineering leads ask us most before starting a cloud migration.

Rehosting moves an application to the cloud with no code changes — the fastest and cheapest path. Replatforming makes small optimizations during the move, such as switching to a managed database. Refactoring rewrites the application to use cloud-native services, the most work but the best long-term performance and cost.

Cloud migration costs $15,000 to $400,000 or more, depending on strategy and scope. A lift-and-shift migration costs $15,000 to $50,000, a replatform migration costs $50,000 to $150,000, and a refactor or cloud-native rebuild costs $150,000 to $400,000 or more.

Cloud migration takes 6 to 40 weeks or more. A lift-and-shift migration takes 6 to 12 weeks, a replatform migration takes 12 to 20 weeks, and a refactor or cloud-native rebuild takes 20 to 40 weeks or longer.

No, if the migration runs the old and new systems in parallel during cutover. We plan a parallel-run period and a tested rollback path, so a migration issue doesn't take your systems offline.

AWS fits teams wanting the widest service catalog, Azure fits teams already invested in Microsoft tools, and Google Cloud fits teams prioritizing data and machine learning workloads. We recommend based on your existing stack, not a default preference.

Yes. We migrate databases using replication tools that keep the source database live and synced until cutover, so data stays consistent and current throughout the move.

A parallel run means operating the old and new systems simultaneously for a defined period before fully cutting over. You need one if downtime or data loss during migration would cause real business harm.

We map data dependencies before migration, transfer data through encrypted channels, and validate record counts and integrity after every transfer before moving to the next stage.

Yes. We handle cloud-to-cloud migrations, such as moving from AWS to Azure, using the same phased approach and parallel-run safeguards as an on-premise migration.

We build a tested rollback plan into every migration before cutover, so we can revert to the source system quickly if validation testing surfaces a problem.

Yes. We offer maintenance retainers covering monitoring, cost optimization, and troubleshooting for the weeks and months after cutover.

Yes. We sign an NDA before the discovery call, before you share any infrastructure or business details with us.